The work deepened in July.
Fire restrictions that arrived in late June became the rhythm of every shift. The Eastern Sierra is dry, and the land makes that plain — in the color of the grasses, the sound of the wind through sage, the way a single spark becomes a conversation worth having with every visitor you meet. Patrol circuits continued: campsites surveyed, six illegal fire rings removed, trash and debris packed out across dispersed sites. Signs were replaced and restocked. Kiosks cleaned. Porta-potties serviced. Some of this work is unglamorous. All of it matters.
Trail and vegetation restoration expanded across the National Scenic Area. The Mobius Arch Trail, Contact Flat, and the LOAF received vegetation work. Vertical mulch sites were identified and restoration boundaries established for the Alabama Hills Trail diversion. Russian thistle mitigation was completed at Happy Boulders. Restoration work extended down Shepards Road and into Long Valley dispersed sites. Each visit to these sites is also a reading of the land — how it’s recovering, where it needs more help, what the summer heat and foot traffic are doing to the margins.
Beyond the Hills, coordination continued with the broader Sierra Forever network: multiple inventory runs to the Eastern Sierra Visitor Center, and a full restoration of all restroom facilities at Crowley Lake Campground — scrubbed, repainted, and returned to good working order.
The dark sky application — introduced here last month — is gaining real traction. Multiple drafts have been revised collaboratively with BLM staff and Alabama Hills Stewardship Group members, and the application is stronger for it. The pre-application inquiry to DarkSky International is now ready to submit, pending final BLM sign-off — a meaningful threshold in a process that began with a single sky quality meter and eleven months of quiet, consistent data collection. An overnight photo session is planned for the August new moon to capture the cardinal direction sky images the application requires. The designation feels close.
A new project also took shape this month: a foundational planning document for a designated accessible climbing area within the National Scenic Area — the first formal step toward a space built for adaptive and para climbers. The work draws on a commitment already written into the Alabama Hills Management Plan, and it arrives at a meaningful moment: paraclimbing will make its Paralympic debut at the 2028 Los Angeles Games, just three hours from here. The planning is early and deliberate, the way good things start.
The Alabama Hills in July is sun-hammered and windswept and full of people who drove a long way to be somewhere that feels real. Helping them find what they came for — and leave it better than they found it — is the job. See you in August!






